You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
ADRs are numbered (0001-…, 0002-…). Each captures one decision with Context / Decision / Consequences. The master overview (00-overview.md) is the entry point and the ADR index.
Requirements files are numbered by section (01-vision.md, 02-philosophy.md, …). Requirement IDs use prefixes like OBJ-30, TOOL-25, etc., and are referenced from code comments and ADRs.
Plans are working documents — they describe what's being built, not what is built. The status audit is the authoritative reconciliation between the plans and the code.