Skip to content

pfullen/TabRetailNew

Repository files navigation

Tab Retail Project App

  • Ruby Version ruby 2.3.1p112 (2016-04-26 revision 54768) [x86_64-linux]
  • Rails Version Rails 5.0.4

Models

-User -> Devise -Projects -> -Roster -Schedule -> -Employees -Client -AdminUser -> STI -ProjectManagers -ShiftManagers -Time

Features

  • Administrate admin Dashboard
  • SMS sending
  • When new project is created it will generate a schedule with the shifts for each week. Each week will get a
    tab
  • Each project will have a roster which is a list of employees that are assigned to the project The employees can then be added or deleted from the roster. If they have been assigned to a new project then their name will appear in red.
  • Per Diem amounts will be color coded on the roster for each employee
  • Each week will have a shedule which will have the shifts. Employees will be added from the roster to the
    shifts.
  • Schedules /shifts with all the employee info can be copied to future weeks
  • Scheudle / shifts cannot be edited when the week is completed.
  • Home screen will be the list of all projects. Color coded for their status
  • Tabs for each company with drop downs will be created. For example a Tab Retail tab with Walmart. Once selected this will generate containers of all these walmart projects. The container will include project info and a roster.

UI:

  • Bootstrap Formating

About

Tab Retail Project Time & Scheduling App

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

 
 
 

Contributors