Skip to content
Closed
Changes from 1 commit
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Next Next commit
doc: remove "How is an LTS release cut?" section
The release process is in the Release plan, linked earlier in the doc.
Don't include information here because duplicated information is likely
to drift apart, resulting in contradictions and a lack of clarity about
which document is correct. (I think the text removed is already
out-of-date. I could be wrong, and it doesn't much matter, as it should
be removed anyway.) It's also not entirely clear what the
utility/relevance of this information is in this particular document.
  • Loading branch information
Trott committed Mar 28, 2019
commit 53a2b97f6bf0de7e9e9a9adb938d5e430f0a2836
7 changes: 0 additions & 7 deletions COLLABORATOR_GUIDE.md
Original file line number Diff line number Diff line change
Expand Up @@ -681,13 +681,6 @@ label.
Attach the appropriate `lts-watch-` label to any PR that may impact an LTS
release.

#### How is an LTS release cut?
Comment thread
Trott marked this conversation as resolved.

When the LTS working group determines that a new LTS release is required,
selected commits will be picked from the staging branch to be included in the
release. This process of making a release will be a collaboration between the
LTS working group and the Release team.

## Who to CC in the issue tracker

| Subsystem | Maintainers |
Expand Down