You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
So I was thinking what could be the next feature (apart from the optimizations) and we could finally dig into the alerting levels and tests that don't run on PRs.
Both can be handled by passing a config object into a test or group of tests (how hard it would be in vitest?) that would tell the test if it should run and what to do next.
The run when and slack could be completely separate and injected at different times if needed. Then we can create more values, like big performance tests running weekly, on call alerting etc.
@ruocco-l can also think how this could be useful for WCC. I think they don't need periodic tests much but could have runWhen.manual for manual worflow triggers
Activity
metalwarrior665 commentedon Apr 2, 2026
@ruocco-l can also think how this could be useful for WCC. I think they don't need periodic tests much but could have runWhen.manual for manual worflow triggers
metalwarrior665 commentedon Apr 5, 2026
I clauded this as a start
metalwarrior665 commentedon Jun 19, 2026
This was resolved by repo config only but without the notification setup. PR was attempted here