You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Each phase is a sub-issue below. Phases overlap; pace to the state of the repo, not the
week numbers. Reference material (comment templates, decision tree, YAML, release steps) is in
the Revival Playbook.
Baseline (captured at transfer)
Metric
Value
Transfer date
between 2026-08-22 and 2026-09-04
Last commit
2023-08-11
Open issues
30
Open PRs
11
Stars / forks
221 / 48
Existing CI
AppVeyor
Last PSGallery release
v2.0.16 (2020-12-18)
PSGallery downloads
fill in
These numbers go in the first release announcement. (Corrected by hand to transfer-time values; the generator ran after the caller workflow commit and six interim issues.)
Working with an AI assistant
Point it at the playbook and this issue. It drafts; you post. Comments on other people's
issues, PR closes, and merges are yours to click.
Activity